Processes

Parent page: Orchestrator › Reports Audience: Process owners, business unit managers, operations teams Prerequisites: End User role


Overview

The Reports › Processes screen (page title Process Report) summarizes, for each process, how many works there were in the selected period and how long they took: total, completed, failed and idle work counts, and the average, longest, shortest and total work time. Each row is a process; for individual works use Reports › Works.

How it differs from the screens with the same name:

  • Process › Processes: the screen where developers create and manage process definitions; it shows no work counts or durations.

  • Dashboards › Process: an inventory of processes (master project, application, run type and input type); it has no dates or work statistics.

On this page you will learn:

  • Who can open the report and which processes are listed

  • The date options and the range each one covers

  • Filters: date filter type and the include options

  • The columns and how counts and durations are calculated

  • Going from a process to its works and exporting to Excel

Process Report — Last 7 Days

Process Report — Last 7 Days


Who can open it and what is listed

Only users with the End User role can open the screen. There is no hierarchy between roles; the Admin, Developer, Monitor or Process Manager role alone is not enough (see User › Users). A user without the role does not see Processes under Reports in the menu; opening the address directly redirects to the Home page.

  • Processes in all branches the user is authorized for are listed; the list is not limited to the branch selected in the top bar.

  • Works are counted according to the user's membership in process groups: a user in a Manager or Viewer group sees all works of the process; a user in a User or Approval Pending group sees only the works they created.

  • Works in every state are counted (Idle, Running, Completed, Failed and others).


Date selection

The calendar button at the top right shows the selected range. When the screen is opened from the menu, Today is selected. Selecting an option reloads the page. The menu and the Date Range window are the same as in the Works report.

Option

Range covered

Today

All of today

Yesterday

All of yesterday

Last 7 Days

The 7 full days before today (today excluded)

Last 30 Days

The 30 full days before today (today excluded)

This Month

From the 1st of the month to the end of the month

Last Month

All of last month

Date Range

Between the start and end times selected in the window; both ends are included

  • Times are in the company's time zone.

  • Which date is compared with the range is set by the Date Filter Type in the filter window (default Work Date).


Filters

The Filters button with the magnifier icon, to the left of the calendar button, opens the Process Report Filters window. Changes are applied only with Search; closing the window with Close discards them. The window has no clear button.

Process Report Filters Window

Process Report Filters Window

Field

Default

Description

Date Filter Type (the unlabeled list at the top of the window)

Work Date

Which date of the work is compared with the selected range. Details below.

Include Disabled

True

With False, disabled works are not counted.

Include Reported

True

With False, works with a report state (Wrong Input, Misoperation, Overlapping) are not counted.

Include Automate

True

Processes with the Automate run type are listed.

Include Schedule

True

Processes with the Schedule run type are listed.

Include On-Demand

True

Processes with the On-Demand run type are listed.

  • In the True/False fields, the button on the right changes the value.

  • At least one of the run type options must be True; if all three are False, the report comes back empty. The run type is taken from the process's current setting.

  • There is no field for selecting a process, branch or resource.

Date Filter Type

Date Filter Type Options

Date Filter Type Options

Option

When a work is counted

Work Date

The work's work date is in the range

Report Date

Any of the work's start, end, work or created date is in the range

Created Date

The work was created in the range

Start Date

The work's last run started in the range

End Date

The work's last run ended in the range

Works whose selected date is empty are not counted; for example, with Start Date selected, works that have not run yet are not in the report.


Records table

If there are no works to count in the selected range, No data found. is shown instead of the table.

Column

Description

#

Row number

Process

Process name. A link for processes in the active branch (see below).

Branch

The process's branch

Total Count

All works of the process counted in the period

Completed Count

Works in the Completed state

Failed Count

Works in the Failed state

Idle Count

Works in the Idle state

Average Work Time

The average work time of the works

Maximum Work Time

The duration of the longest work

Minimum Work Time

The duration of the shortest work

Total Work Time

The sum of the works' work times

  • A work's work time is End Date − Start Date of its last run. Only works with both dates filled in, that is works that ran and finished, are included in the duration figures; idle and running works are not.

  • Durations are in days.hours:minutes:seconds (e.g. 00.21:11:05 = 21 hours 11 minutes 5 seconds).

  • Total Count also includes works in states that have no column (Running, Expired, Debugging); it can therefore be greater than the sum of the three counts.

  • The last row of the table is Total: it shows the sum of Total Work Time for all processes. The count columns are not summed.

  • Rows are sorted by process name. Clicking a column header sorts the table on the page by that column. There is no search or paging.

Going from a process to its works

The process name (bold, linked) opens the process's works in the same tab:

  • If the user has the Queue › Works screen (Developer role), that screen opens filtered by the process.

  • Otherwise the Works screen opens filtered by the process.

The date and report filters are not carried over; the target screen opens with its own default filters. The link exists only for processes of the branch selected (active) in the top bar; processes of other branches are plain text.


Exporting to Excel

The Excel button (Download Report) downloads the report as an Excel file.

  • File name ProcessReport_<ddmmyyyy>.xlsx, a single sheet Sheet1.

  • The columns are the same as on the screen (without #): Process, Branch, the counts and the four durations. Below the last row are Total and the total work time.

  • The selected date option and filters are applied; the data is read again at download time.

There is no PDF or chart download.


Notes

  • The report does not refresh by itself; the figures are the values at the moment the page was loaded.

  • For the list of individual works use Reports › Works; for the time resources spent on processes use Reports › Resources.