Get Work

This method is used to list the work items of a specific process in detail, according to the given date ranges.


⬅️INPUT

Parameter

Type

Required

Description

ProcessName

String

❌No

Process name

Id

Guid?

❌No

Work ID

RelatedWorkId

Guid?

❌No

Related work ID

ReportDateBegin/End

DateTime?

❌No

Report date range

WorkDateBegin/End

DateTime?

❌No

Work date range

CreatedDateBegin/End

DateTime?

❌No

Creation date range

StartDateBegin/End

DateTime?

❌No

Start date range

EndDateBegin/End

DateTime?

❌No

End date range

IncludeCompleted

Boolean?

❌No

Include completed

IncludeFailed

Boolean?

❌No

Include failed

IncludeIdle

Boolean?

❌No

Include idle

IncludeRunning

Boolean?

❌No

Include running

IncludeExpired

Boolean?

❌No

Include expired

IncludeDisabled

Boolean?

❌No

Include disabled

IncludeReported

Boolean

❌No

Include reported

DescriptionFilter

String

❌No

Description filter

StatusNoteFilter

String

❌No

Status note filter

NoteFilter

String

❌No

Note filter


➡️OUTPUT

Parameter

Type

Description

IsGetWorkSuccessful

Boolean

Success status

GetWorkMessage

String

Result message

GetWorkResult

List<PAWGetWorkResult>

Work list

GetWorkRecordCount

Int32

Record count


🎯 Purpose

  • Retrieve the work records of a process in bulk

  • Analyze work items created in specific date ranges

  • Support reporting and monitoring processes


⚙️ How It Works

  • At least one date parameter must be entered for the method to run

  • Matching work items are filtered and returned according to the given date ranges

  • If only a start date is given:

    • All work items from that date until today are retrieved

  • If a start date and an end date are given together:

    • Work items in the specified date range are listed


📥 Input Parameters

🔹 Report Date Begin

The start date for filtering.


🔹 Report Date End (Optional)

The end date for filtering.
If left empty, data from the start date until today is retrieved.


🔹 Other Date Fields

Filtering can be done by the following date types:

  • Work Date

  • Created Date

  • Start Date

  • End Date


📌 Report Date Logic (Important)

  • The Report Date Begin and Report Date End fields work like a union of the other date fields

  • Within the given date range:

    • All work items matching the Work, Created, Start and End date criteria are returned

  • Even if the same work item matches more than one date criterion:

    • It is listed only once (no duplicates)

📍 Example:
If a work item matches both the start date and the end date, it is returned as a single record, not twice.


📤 Output

  • Work records of the process

  • Detailed information for each work item (status, date information, input/output, etc.)


⚠️ Important Notes

  • The method does not run unless at least one date filter is entered

  • Wide date ranges may affect performance

  • Union logic is applied to prevent duplicate records


💡 Usage Scenarios

  • Daily / weekly work reports

  • Error analysis in a specific date range

  • Process performance measurement

  • SLA and operations tracking


💡 Summary

The Get Work method retrieves the work records of processes in a date-based and detailed way, providing a powerful data source for reporting, analysis and operational monitoring.