Parent page: Orchestrator Audience: All users (End Users, Operations, Process Managers) Prerequisites: Being signed in; the data shown depends on the process groups you belong to on the Process › Groups screen
Overview
Home is the screen that opens after you sign in and when you click Home in the left menu. The screen's title is Works Dashboard: it counts the works of the processes you are authorized for in the selected time range by state, and shows them in a chart and in a per-process table.
Home only gives a summary; to see the works themselves and act on them, use the Works or Queue › Works screens. For detailed, filterable figures, see the Reports group.
What you will learn on this page:
Which works the dashboard counts
Date selection, the Select Month and Month Range windows
The chart and the Process List
Downloading the chart and the report

Home — Works Dashboard, This Year
Which works are counted
Topic | Rule |
|---|---|
Processes | Processes for which you are a member of any process group (Manager, User, Approval Pending, Viewer). Processes in all branches you are authorized for are counted; disabled processes are included. |
Works | If you are Manager or Viewer in the process, all works of the process; if you are User or Approval Pending, only the works you added. |
States | Idle, Completed and Failed works are counted. Works in the Running state are not counted. |
Excluded | Works with a report state (see Queue › Works › Report State) and disabled works that never ran. |
Date of a work | The work's End Date; if empty, its Start Date; if that is empty too, its Work Date. A work is counted if this date is in the selected range. |
Dates are calculated in the company's time zone.
Date selection
The calendar button at the top right (Select Date) shows the selected range. When the screen first opens, Today is selected. When the range changes, the page reloads and the chart returns to the total view.

Select Date Menu
Option | Range covered | Horizontal axis of the chart |
|---|---|---|
Today | Today 00:00 to tomorrow 00:00 | Hour |
Yesterday | Yesterday 00:00 to today 00:00 | Hour |
Last 7 Days | The previous 7 days, excluding today | Days of the week |
Last 30 Days | The previous 30 days, excluding today | Day |
This Month | From the 1st of the month to the 1st of next month | Day |
Last Month | All of last month | Day |
This Year | All of this year | Month |
Last Year | All of last year | Month |
Select Month | The single selected month | Day |
Month Range | From the start of the first selected month to the end of the last | Month |
In the hourly chart, each point shows the works in the one-hour slot that ends at the hour on its label.
Select Month and Month Range
These two options each open a window. You pick the month in the field under Filters and click Search to load the dashboard for that range; Close clears the selection.
Select Month: You pick a single month. Search stays disabled until a month is selected.
Month Range: You pick the start month first, then the end month (the field's hint: Select Start Month). After the first month, the message Please select end date appears. The range can be at most 12 months (Month range can't be higher than a year.) and the end month cannot be before the start month (Second date cant be older than first date). Search stays disabled until two valid months are selected.

Month Range Window — January–June 2026 Selected
⚠️ Warning: Ranges longer than a year are rejected (Date range can't be higher than a year.) and the dashboard appears empty.
Chart
If at least one work is counted in the selected range, the chart card appears at the top of the dashboard.
Title: Total or the name of the selected process, followed by n Total Work | n Idle - x% | n Completed - y% | n Failed - z%. Total Work is the sum of Idle, Completed and Failed works; rates are rounded to two decimals.
Series: Completed (green), Fail (red), Idle and Total. Clicking a series in the legend hides or shows it again; hovering over the chart shows the values at that point.
The chart does not lead to another screen.
Process List
The Process List below the chart shows one row for each process that has counted works in the range; processes with no works are not listed. The last row is Total. The list has no paging, sorting or search. If there are no works in the range, it shows No data found.
Column | Description |
|---|---|
# | Row number |
Name | Process name. Names longer than 50 characters are shortened; the full name appears in the tooltip. |
Idle, Failed, Completed | Number of works in that state |
Total | Sum of the three states |
Idle Rate, Failed Rate, Completed Rate | Percentage of the state in the total |
Average Success Work Time | Average run time of completed works (days.hours:minutes:seconds) |
Average Fail Work Time | Average run time of failed works |
Clicking a row refreshes the chart and its title with that process's data. Clicking the Total row brings the chart back to all processes. Rows do not lead to the works list.
Downloading
Button | When it is shown | What it does |
|---|---|---|
Download Chart | When there is a chart | Downloads the chart as |
Download Report | Always | Downloads the Process List as an Excel file ( |
Notes
The dashboard does not refresh by itself. To see current figures, reload the page or change the date selection.
The page reloads when the language or the branch is changed.