Calendar
Parent page: Orchestrator › Process Audience: Developers Prerequisites: Developer role
Overview
The Process › Calendar screen shows on a calendar when processes are planned to run. The screen is for viewing only; records are not added or changed from the calendar, and entries cannot be dragged.
Only processes assigned to at least one resource appear on the calendar:
Automate processes are shown in purple. Each time range in the process's run times (from the Work Dates template or from the process form) is drawn as an entry on the matching weekdays, within the process's start and end dates. A 00:00–24:00 range appears as an all-day entry.
Schedule processes are shown in blue. Each enabled schedule is expanded within its own start and end dates: Daily, Weekly, Monthly, Yearly and Once schedules give a single entry at the start time; Hourly and Minutely schedules give an entry each day that covers the start–end time window.
On-Demand processes do not appear on the calendar.
Holidays are not taken into account for Automate process entries; entries also appear on holidays. Processes that have a holiday do not run on it; see the Holidays page for details. The meaning of the colours is not explained on the screen.
Month View

Process › Calendar — Month View
Filters
They are lined up above the calendar, without labels. The calendar is redrawn whenever one of them changes.
Filter | Description | Default |
|---|---|---|
Branch | Filters processes by their branch. | All Branches |
Resource | Shows only processes assigned to the selected resource. | All Resources |
Process | Shows only the selected process. | All Processes |
Scheduled Processes Visible / Hidden | Turns the entries of Schedule processes on or off. | On |
Automated Processes Visible / Hidden | Turns the entries of Automate processes on or off. | On |
If both switches are turned off, the calendar appears empty.
Navigation and views
Button | Description |
|---|---|
‹ / › | Moves to the previous or next month, week or day. |
Today | Returns to the period that contains today. |
Month / Week / Day / List | Changes the view. Month is the default view; the week starts on Monday. |
In the month view, a "+N more" link appears for entries that do not fit in a day. Clicking a day or week number opens that day or week.
Entry Details
Hovering over an entry opens its details; in the Week, Day and List views the same information is written under the entry.

Process › Calendar — List View
Line | Description |
|---|---|
Frequency | For Automate processes, the time range, e.g. "Frequency between 12:00 and 24:00". For Schedule processes, the schedule type and frequency, e.g. "Daily Type - with 1 frequency", "Hourly Type - with 3 frequency between 20:00 and 23:45", "Weekly Type - will be running on …". The schedule type is written with its English name in both languages. |
Branch | The process's branch. |
Resources | The resources the process is assigned to, each as "Description (Name)". |
Clicking an entry opens that process's details on the Processes screen if the process belongs to the active branch. Entries of processes in other branches cannot be clicked.