# Flowchart

Runs activities as nodes linked to each other by connections on a canvas. The flow starts from the **Start** icon and follows the connections; **Flow Decision** is used to branch on a condition, **Flow Switch** to branch on a value.


---

### :arrow_down:**MISC**

| **Parameter** | **Type** | **Default** | **Description** |
|-----------|------|---------|-------------|
| `ValidateUnconnectedNodes` | `Boolean` | `False` | If `True`, the workflow reports a validation error when there is a node that cannot be reached from **Start** (unconnected); the settings of unconnected nodes are also validated. If `False`, unconnected nodes are ignored and do not run. |


---

### Usage

* Activities, **Flow Decision** and **Flow Switch** are dragged and dropped onto the flowchart canvas. Nodes are connected by dragging from a node's connection point to the other node.
* A connection is drawn from the **Start** icon on the canvas to the first node; the flow starts from this node. If there are nodes on the canvas but **Start** is not connected, the workflow reports a validation error. If there are no nodes, the flowchart ends without doing anything.
* Only one outgoing connection can be drawn from an activity node; when the activity finishes, the node at the target of this connection runs. **Flow Decision** has separate exits for **True** and **False**, and **Flow Switch** for each case and **Default**.
* A node can have multiple incoming connections. A loop can be built by drawing a connection to an earlier node.
* When a node with no outgoing connection finishes (or if the selected branch is not connected), the flowchart completes.