Get Work
This method is used to list the work items of a specific process in detail, according to the given date ranges.
⬅️INPUT
Parameter | Type | Required | Description |
|---|---|---|---|
|
| ❌No | Process name |
|
| ❌No | Work ID |
|
| ❌No | Related work ID |
|
| ❌No | Report date range |
|
| ❌No | Work date range |
|
| ❌No | Creation date range |
|
| ❌No | Start date range |
|
| ❌No | End date range |
|
| ❌No | Include completed |
|
| ❌No | Include failed |
|
| ❌No | Include idle |
|
| ❌No | Include running |
|
| ❌No | Include expired |
|
| ❌No | Include disabled |
|
| ❌No | Include reported |
|
| ❌No | Description filter |
|
| ❌No | Status note filter |
|
| ❌No | Note filter |
➡️OUTPUT
Parameter | Type | Description |
|---|---|---|
|
| Success status |
|
| Result message |
|
| Work list |
|
| Record count |
🎯 Purpose
Retrieve the work records of a process in bulk
Analyze work items created in specific date ranges
Support reporting and monitoring processes
⚙️ How It Works
At least one date parameter must be entered for the method to run
Matching work items are filtered and returned according to the given date ranges
If only a start date is given:
All work items from that date until today are retrieved
If a start date and an end date are given together:
Work items in the specified date range are listed
📥 Input Parameters
🔹 Report Date Begin
The start date for filtering.
🔹 Report Date End (Optional)
The end date for filtering.
If left empty, data from the start date until today is retrieved.
🔹 Other Date Fields
Filtering can be done by the following date types:
Work Date
Created Date
Start Date
End Date
📌 Report Date Logic (Important)
The Report Date Begin and Report Date End fields work like a union of the other date fields
Within the given date range:
All work items matching the Work, Created, Start and End date criteria are returned
Even if the same work item matches more than one date criterion:
It is listed only once (no duplicates)
📍 Example:
If a work item matches both the start date and the end date, it is returned as a single record, not twice.
📤 Output
Work records of the process
Detailed information for each work item (status, date information, input/output, etc.)
⚠️ Important Notes
The method does not run unless at least one date filter is entered
Wide date ranges may affect performance
Union logic is applied to prevent duplicate records
💡 Usage Scenarios
Daily / weekly work reports
Error analysis in a specific date range
Process performance measurement
SLA and operations tracking
💡 Summary
The Get Work method retrieves the work records of processes in a date-based and detailed way, providing a powerful data source for reporting, analysis and operational monitoring.