# 💻 Resources

**Parent page:** Orchestrator › Resource **Audience:** RPA Operations Teams, System Administrators **Prerequisites:** Monitor role


---

## Overview

The **Resource › Resources** screen is where the machines that robots run on (resources) are defined and monitored. Each resource corresponds to a Windows machine. The **PAW Resource** application running on the machine matches this record, requests work from the queue and reports its state to the Orchestrator. Which processes' work a resource takes is set on this screen, either one by one or through a [Process Group](/doc/process-groups-Xb1foy3znl).

Developers who are granted access can connect to production resources with remote access enabled from the remote access workspace of PAW Resource (see [Remote Access](/doc/remote-access-gKGU7ZuO2h)). A resource's scheduled restart calendar is defined with [Restart Groups](/doc/restart-groups-cUcNxATLrj) and its remote session account with [Credentials](/doc/credentials-n8e7lETgOc); the history of state changes is on the [Histories](/doc/histories-WvuoU35iU0) screen.

What you will learn on this page:

* Resource states and the resource list
* Adding a resource; remote access and scheduled restart settings
* Resource details and the Actions menu
* Assigning processes to a resource and priority in work distribution
* Remote access users
* Restart, machine key and deletion rules
* How it differs from the report and dashboards with the same name


---

## Resource States

| State | Meaning |
|-------|---------|
| Idle  | The resource is ready to take work from the queue. |
| Running | The resource is running a queue work item. The running process and project are shown in the list and in the details. |
| On Hold | The resource does not take work. New production resources are created in this state; **Set Idle** is needed for it to take work. |
| Terminate | Termination of the running work was requested. PAW Resource closes the robots and sets the resource to **On Hold**. |
| Restarting | The machine is restarting. At startup PAW Resource closes the robots and sets the resource to **Idle**. |

States change as follows:

* **Idle → Running:** when PAW Resource takes work from the queue.
* **Running → Idle:** when the work finishes.
* **Running → Terminate:** when **Terminate** is selected on the web or in PAW Resource.
* **Terminate → On Hold:** after PAW Resource closes the robots.
* **On Hold → Idle:** when **Set Idle** is selected on the web or in PAW Resource.
* **Idle / On Hold → Restarting:** if there is a restart request for the resource (see *Restart*).

Each transition writes a record to the [Histories](/doc/histories-WvuoU35iU0) screen. A disabled resource does not take new work; disabling does not stop the running work.

> 💡 **Tip:** In the PAW Resource application the **Terminate** state is shown as **Terminating**.


---

## Resource List

 ![Resource › Resources](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/bf0b6392-4a12-48da-a760-95cc668d4231/kaynak-en-r1.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=192e505ffd3a7e06dd506234c8608773b267366d255bceab2dd7e3dee4966e85&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3600x1986")

### Top buttons

| Button | Description |
|--------|-------------|
| Actions › Restart | Creates a restart request for the selected resources. The confirmation asks `"{0}" will be restarted`. If nothing is selected, the "No records selected!" warning appears. |
| New Record | Adds a new resource (see *Adding a Resource*). |
| Export | Downloads the **Selected Records**, **Current Page** or **Current Filter** records as Excel (XLSX, XLS), Open Document (ODS) or Text (CSV). |
| Enable / Disable | Enables or disables the selected resources. A resource that is being updated cannot be enabled: `Resource has been updating since "{0}" and cannot be enabled.` |

### Row actions

| Action | When visible | Description |
|--------|--------------|-------------|
| Edit   | Always       | Opens the Resource Edit window. |
| Details | Always       | Opens the resource details. |
| Delete | Always       | Deletes the resource (see *Deletion*). |
| ⋮ › Info | Always       | Shows the users who created, modified and disabled the record, with dates. |
| ⋮ › Set Idle | State On Hold | Sets the resource to Idle; the resource starts taking work again. |
| ⋮ › Terminate | State Running | Requests termination of the running work. |
| ⋮ › Enable / Disable | Depending on the record | Enables or disables the resource. |

### Columns

Default columns: Name, Description, Created User, Created Date, Process, Project, Ip, Machine Key, State, Machine Type, Process Group, Use PAW Robot, Use UI Path, Use Blue Prism. **Process** and **Project** show the process and project version running at the moment. Modified User, Modified Date, Is Enabled, Disabled User, Disabled Date, Remote Access Enabled, Credential and Remote Access State are added from the column selector.

### Filters

The **Resource Filters** window opened with **Filters** has four sections:

| Section | Fields |
|---------|--------|
| Filters | Name, Description, State, Process Group, Machine Type, Machine Key, Ip, Is Enabled, Use PAW Robot, Use UI Path, Use Blue Prism |
| Date    | Created Date and Modified Date ranges |
| Remote Access | Is Enabled (whether remote access is enabled), Credential, State (remote access state, multiple selection) |
| Restart | Type, Notify On Trigger, Notify On Complete, Is Restart Requested, Is Running, Triggered Date and Completed Date ranges |


---

## Adding a Resource


1. Click **New Record** in the list; the **Resource New Record** window opens.
2. Enter the machine's Windows computer name in **Name**. PAW Resource finds the resource by this name at the first login.
3. Fill in **Machine Type** and **Ip**; select the applications the resource will run (**Use PAW Robot**, **Use UI Path**, **Use Blue Prism**).
4. To take the processes from a group, select a **Process Group**. Otherwise you can add the processes one by one from the details after saving.
5. If the production resource will be accessed remotely, select **Remote Access Enabled**; in the **Remote Access** panel that opens, select the **Credential**. If **Port** is empty, 7200 is filled in.
6. If the machine will be restarted regularly, select **Is Schedule Restart Enabled**. Select a **Restart Group** or enter the calendar yourself in the **Restart** panel.
7. Click **Save**.

 ![Resource New Record — Remote Access and Scheduled Restart Enabled](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/780c914a-de3c-41d3-943c-562359accee4/kaynak-en-r2.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=9547ea48ce9e0e1ac5df5f0ac469b87d71a39d5419ff04999f9ac02e8c0bc7fc&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3198x1818")

| Field | Description |
|-------|-------------|
| Name  | Required and unique. Must be the same as the machine's Windows computer name. Cannot be changed after the machine key is set. |
| Description | Short description. |
| Machine Type | Required. **Production**: production machine that takes work from the queue. **Development**: machine where developers build robots; it does not take work from the queue. |
| Ip    | Required; must be a valid IP address. Remote connections are made to this address. |
| Process Group | If selected, the group's processes are copied to the resource and kept in sync with the group (see *Assigning Processes*). |
| Use PAW Robot, Use UI Path, Use Blue Prism | Determine which application's projects the resource can run. A process runs only on resources where its application is selected. |
| Remote Access Enabled | Visible only when Machine Type is **Production**. When cleared, Credential and Port are cleared and scheduled restart is turned off. |
| Credential | Required when remote access is enabled. The credentials defined on the [Credentials](/doc/credentials-n8e7lETgOc) screen are listed. The PAW Resource Remote Service on the machine opens the Windows session with this account. |
| Port  | Required when remote access is enabled; between 1 and 65535, default 7200. Remote connections are made to this port. |
| Is Schedule Restart Enabled | Can be selected only when remote access is enabled; opens the **Restart** panel. |
| Restart Group | If selected, Type, Trigger Time, the days and the notification fields are filled from the group and locked. When the group changes, the calendar changes too. |
| Type  | **Weekly** or **Monthly**. |
| Notify On Trigger, Notify On Complete | If selected, a notification and e-mail are sent to users with the Monitor role when the restart starts or finishes. |
| Trigger Time | Time of day; selected with the slider in 5-minute steps. |
| Week Days / Month Days | If Type is Weekly, the days of the week; if Monthly, **First Business Day**, 1–31, **Last Day of Month** and **Last Business Day** are selected. At least one day must be selected. |

A new **Production** resource is created in **On Hold** state, a **Development** resource in **Idle** state. For a production resource to start taking work, PAW Resource must log in on the machine and the resource must be set to Idle with **Set Idle**.

### Errors when saving

| Situation | Message |
|-----------|---------|
| The name exists on another resource | Specified Name already exists. |
| Invalid IP | "Ip" input is not valid. |
| Use Blue Prism selected, no Blue Prism connections in the company | You must first specify company Blue Prism DB Connection and Blue Prism Connection. |
| Production + Use PAW Robot, robot count in the license is full | Your license robot limit has been exceeded. Allowed limit: {0}. |
| Number of production resources exceeds the license | Your license resource limit has been exceeded. Allowed limit: {0}. |
| Development + Use PAW Robot, robot developer count is full | Your license robot developer limit has been exceeded. Allowed limit: {0}. |
| Remote access enabled, Credential or Port empty | "Remote Access - Credential" is required. / "Remote Access - Port" is required. |
| Port out of range | Remote Access - Port must be greater than zero. / Remote Access - Port must equal or lesser than 65535 |
| Scheduled restart enabled, calendar incomplete | "Restart - Type" is required. (or Trigger Time, Trigger Days) |

License limits are shown on the [License](/doc/license-1XqTnAIYBd) screen.

### Editing

The **Resource Edit** window opened with **Edit** contains the same fields. Differences:

* The name of a resource with a machine key cannot be changed: "Machine Key specified can not update Resource Name."
* Machine Type can be changed from **Production** to another type only while the resource is Idle, On Hold or Restarting: "You can't change resource Machine Type if state is not Idle, Restarting or Onhold."
* If a process group is given to a resource that has remote access users, the confirmation "A process group definition was added. Remote access users on this resource will be deleted." is shown. The resource then uses the group's remote access users.
* If the process group is removed from a resource with remote access enabled, "Transfer all remote access users?" is asked. **Yes**: the group's users are copied to the resource. **No**: they are not copied and open remote sessions are closed.


---

## Resource Details

Clicking **Details** in the list opens the **Resource Details** window.

 ![Resource Details — Actions Menu Open](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/e9587dff-4d29-43a6-aac9-f2ad13e5f569/kaynak-en-r3.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=85ab0371dc2db43ea475c0adc6e863717fcd5d9478449e9843badbc4718bec97&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3198x1236")

The top form contains the record fields, Machine Key and State. Production resources also show these panels:

| Panel | Fields |
|-------|--------|
| Status | **Process** and **Project** (running work), **User** (the user who last logged in to PAW Resource), **Is Restart Requested** and, if requested, the request date. |
| Remote Access | If remote access is enabled: **Credential**, **Port**, **State** (remote access state), **Is Schedule Restart Enabled**, **Restart Group**. |
| Restart | If scheduled restart is enabled: calendar and notification settings, **Is Running**, the **Triggered Date** and **Completed Date** of the last restart, **Next Restart Time**. |

### Remote access state

PAW Resource on the machine updates this value at most once a minute. A connection can be made only while the state is **Running**; otherwise the message "Remote access is not ready on this resource yet." is shown.

| State | Meaning |
|-------|---------|
| Running | The remote service is installed and running, auto login is defined, the session is connected to the console. |
| Not Running | The remote service is installed but stopped. |
| Not Installed | The remote service is not on the machine. |
| Console Not Connected | The auto login user's session is not on the console. |
| User Disconnected | The user session is disconnected. |
| Signed Out | PAW Resource was signed out. |
| Auto Login Not Active | PAW Resource was not opened with auto login, or the remote service configuration could not be read. |

### Top buttons

| Button | When visible | Description |
|--------|--------------|-------------|
| Actions › Add Remote Access User | Remote access enabled, Machine Type Production and the resource is not in a process group | Adds a user who can connect to the resource (see *Remote Access Users*). |
| Actions › Add Process | The resource is not in a process group | Assigns a process to the resource (see *Adding a Process*). |
| Actions › Restart | Remote access enabled, no pending restart request and state is not Restarting | Creates a restart request after confirmation. |
| Actions › Terminate | State Running | Requests termination of the running work. |
| Actions › Set Idle | State On Hold | Sets the resource to Idle. |
| Actions › Clear Machine Key | Machine key is set | Deletes the key after confirmation (see *Machine Key*). |
| Actions › Set Machine Key | Machine Type Development | Opens a window to enter the key manually. |
| Actions › Save As Process Group | The resource is not in a process group | Creates a new process group from the resource's processes (below). |
| Disable / Enable, Delete, Edit | Always       | Same as the actions in the list. |
| Previous / Next | Always       | Goes to the previous or next record in the list. |

### Sub-tables

 ![Resource Details — Remote Access Users, Processes and Runs](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/d8244a09-78b6-405c-866c-743e328f8b40/kaynak-en-r4.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=30a2ee021bb15e24d640775f068abc65975f54b1eb9b20af37291f0d59171229&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3198x2918")

| Table | Content |
|-------|---------|
| Remote Access Users | Users who can connect to the resource and their access types. If the resource is in a process group, the group's users are listed read-only. |
| Scheduled Processes | Assigned processes with execution type **Schedule**: Order Number, Process, Branch, Startup Parameter, Application, Is Enabled. |
| Automated Processes | Assigned processes with execution type **Automate**; the columns are the same. |
| Runs  | Recent runs: Process, Master Project, Project, Created Date, Message, Start Date and End Date. **Details** opens the logs of the run. |
| History | The last 20 state changes: From Resource State, To Resource State, with process and project information. |

The **Filter** box at the top searches rows in the process and user tables. For older records, the **For More Rows Click Here** link below the table opens the [Histories](/doc/histories-WvuoU35iU0) screen filtered to this resource.

### Save As Process Group

If the resource's process assignment will also be used on other resources, it can be turned into a group with **Actions › Save As Process Group**.

| Field | Description |
|-------|-------------|
| Name  | Name of the new process group; required and unique. |
| Set On This Resource | If selected, the resource is linked to this group; the resource's own remote access records are deleted. |
| Copy Remote Access Records | Visible only if the resource has remote access users. If selected, the users are copied as the group's users. |

All processes of the resource are copied to the new group with their startup parameter, enabled state and order. If the resource has no processes, the error "Process not defined on resource" is shown.


---

## Assigning Processes

Assigning a process to a resource means that the resource can take that process's queue work. Assignments are rows that belong to the resource; even when a process group is used, the group produces these rows and keeps them in sync.

### Adding a Process

In the details, **Actions › Add Process** opens the **Resource Process New Record** window; the resource's name is shown in the title.

 ![Resource Process New Record](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/27ff1170-91fd-420f-ba6d-f8ba8532e4cb/kaynak-en-r5.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=d64f3edd205c729c68f43126c5ba33dc2616ac95f595af672f454d9db37d3c91&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3198x1280")

| Field | Description |
|-------|-------------|
| Process | Required. Listed grouped by branch. Processes already assigned to the resource and processes with execution type **On-Demand** are not in the list. |
| Startup Parameter | One of the selected process's parameters. The values of the selected parameter are shown as a table in the **Startup Parameter** panel. The robot starts the work on this resource with this parameter. |
| Description | Multi-line description. |

The process must have an active project version on the [Processes](/doc/processes-PiGf9xnK12) screen. The same process cannot be added to a resource twice: "Specified Resource Process already exists."

In the resource process details, **Edit** changes only Startup Parameter and Description. If the resource is in a process group, processes cannot be added, edited or deleted; this is done in the group. Enabling or disabling a single process on this resource is still allowed.

### Order and priority

* The order in the tables is the priority. **Schedule** processes are always tried before **Automate** processes.
* On a resource that is not in a group, rows are reordered by dragging; the order is saved with the **Save** button that appears below the table. The **Order Number** column shows the row order starting from 1.
* A disabled assignment means the process does not run on this resource.

### Work distribution

While the resource is Idle, PAW Resource requests work from the Orchestrator. The Orchestrator follows these steps:


1. If the resource is disabled, not Idle or has a restart request, it gives no work. Only **Production** resources take work.
2. It tries the resource's enabled processes in order. It skips a process when:
   * The process's application is not selected on the resource (Use PAW Robot / UI Path / Blue Prism).
   * Today is not a working day in the process's holiday calendar (see [Holidays](/doc/holidays-cPClTUTuw1)).
   * The process has a resource limit and the limit is reached.
   * The process is in a [Block Group](/doc/block-groups-2xEsa9hLjm) and another process of the same group is running.
   * The process, the master project or the active project is disabled.
   * An Automate process is outside its defined working dates and hour ranges.
3. For a suitable process it looks for an approved, enabled work item in Idle state whose time has come (or with **Run Immediately** selected) in the queue.
4. If work is found, the resource becomes **Running** with that process and project. If not, the resource stays Idle and asks again after a while.


---

## Remote Access Users

Remote access lets developers watch or use the screen of a production resource from their own machines. This table determines **who can connect**.

In the details, **Actions › Add Remote Access User** opens the **Remote Access User New Record** window.

 ![Remote Access User New Record](https://outline-production-attachments.s3-accelerate.amazonaws.com/uploads/a406920a-3878-4f5f-8f8b-7593ba62e617/3ef2a597-6a87-49a7-8b7a-8c889506c1af/kaynak-en-r6.png?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA4EOUDTOVUICLPZ4P%2F20261123%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261123T231500Z&X-Amz-Expires=86400&X-Amz-Signature=c46991a35c47bf8825e6241798325daedb468d74f91ee9dfa07360458022a354&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject " =3198x560")

| Field | Description |
|-------|-------------|
| User  | Required. Only users in the active branch, of UI type, with the **Developer** role and not yet added to this resource are listed. |
| Access | Required. **View Only**: the user only watches the screen. **Interactive**: the user can switch between watching and interactive mode. |

**Edit** changes only Access. When the record is deleted, the user's access to this resource is revoked and their open session is closed. The open session also drops if the user is disabled or remote access is turned off on the resource.

> ⚠️ **Warning:** This button is visible only when the resource is not in a process group. The remote access users of resources in a group are defined for the group on the [Process Groups](/doc/process-groups-Xb1foy3znl) screen and apply to every resource in the group.

### How a connection is made


1. The developer logs in to PAW Resource on their own machine; in the remote access workspace in **Developer Mode** they see the production resources they are authorized for.
2. When they connect to a resource, the Orchestrator generates a short access token valid for one minute. For this, the resource's remote access state must be **Running** and the user must be enabled.
3. The connection is made to the resource's **Ip** address and remote access **Port**; the PAW Resource Remote Service on the machine validates the token and grants access.
4. If a **View Only** user tries to switch to interactive mode, they get the message "Interactive mode is not allowed for view-only remote access users."

See the [Remote Access](/doc/remote-access-gKGU7ZuO2h) page for details. Who connected when is tracked on the [**Admin › Remote Access Logs**](/doc/remote-access-logs-uee5cuBkbP) screen (Admin role only).

| Situation | Message |
|-----------|---------|
| Access not selected | "Access" is required. |
| User is not of UI type | User must be UI User type |
| User does not have the Developer role | Only developer role users allowed. |
| User already added to this resource | Specified User and Resource remote access combination already exists. |


---

## Restart

A resource is restarted in three ways: **Actions › Restart** in the list, **Actions › Restart** in the details, or the scheduled restart calendar.

* Once a request exists, the resource takes no new work. If work is running, the work finishes first.
* When the resource is Idle or On Hold, PAW Resource sets the state to **Restarting** and restarts the machine immediately. At startup the request is cleared and the resource goes to Idle.
* If a request already exists, the message "Restart already requested." is shown.
* Scheduled restart is checked every 5 minutes. On an enabled production resource, a request is created if it has not run yet today, the day matches the calendar and Trigger Time has passed.
* If **Notify On Trigger** and **Notify On Complete** are selected, users with the Monitor role get the "Resource Restart Triggered" and "Resource Restart Completed" notifications.

> 💡 **Tip:** If no signal comes from an enabled production resource that is not On Hold for more than 5 minutes, users with the Monitor role get the "Resource Unreachable" notification. The live state of resources is monitored on the [Resource Live](/doc/resource-live-k2dlTfc2ty) dashboard.


---

## Machine Key

At the first login, PAW Resource finds the resource by the machine name and writes the machine's key to the record. From then on the resource can be used only from this machine; logging in from another machine gives the error "Machine Key is not valid. Check resource machine key."

* To move the resource to another machine, use **Actions › Clear Machine Key** in the details. The first PAW Resource login on the new machine writes the key again.
* On development resources, **Actions › Set Machine Key** is used to paste the value obtained with **Get Machine Key** in PAW Resource. If the value is not a valid GUID, the error "Invalid Machine Key" is shown.

On a production machine, users with the **Resource** or **Developer** role can log in to PAW Resource; on a development machine, only users with the **Developer** role.


---

## Deletion

* A resource that has a record in any queue work item cannot be deleted: "This resouce has a record queue. You can not delete it." To retire such a resource, disable it.
* When a resource is deleted, its process assignments and history records are deleted too.


---

## Differences from Screens with the Same Name

| Screen | What it shows |
|--------|---------------|
| Resource › Resources (this screen) | Resource definition, process assignments, remote access and restart settings; state commands. |
| [Reports › Resources](/doc/resources-Zgr9ULCkL2) | Resource working time per process for the selected date range, in total and day by day. Does not change records; can be downloaded. |
| [Dashboards › Resource](/doc/resource-cZkiAC2MlA) | Occupancy and working time charts of production resources (today, yesterday, last 7/30 days, month). |
| [Dashboards › Resource Live](/doc/resource-live-k2dlTfc2ty) | Live state of all production resources, the running process, whether they are online and the last signal time. |
| [Processes](/doc/processes-PiGf9xnK12) › details › Show Resources | The resources a process is assigned to; only enabling and disabling this assignment is possible. |

### Roles

* This screen and its sub-windows (Resource Process, Remote Access User) are open to the **Monitor** role.
* Users who will connect with remote access must have the **Developer** role.
* The [Histories](/doc/histories-WvuoU35iU0) screen is visible to the Developer and Monitor roles, Remote Access Logs only to the Admin role.
* Resource unreachable, restart and automatic process disable notifications go to users with the Monitor role.