Work Dates
Parent page: Orchestrator › Process Audience: Developers Prerequisites: Developer role
Overview
The Process › Work Dates screen manages weekly working templates that set on which days and at which hours Automate processes can run. In a template each day is active or passive; an active day has up to seven time ranges between 00:00 and 24:00.
A template is selected in the Work Date field of processes whose Run Type is Automate on the Process › Processes screen. When a template is selected, the process form shows the template's days read-only; without a template, the days and time ranges are set for the process itself. An Automate process must either have a work date or have at least one active day.
Work dates are not separated by branch; they are listed for all branches of the company.
What you will learn on this page:
How time ranges are applied to processes
The Work Dates list and filters
Adding a work date and setting days and time ranges
Work date details and deletion
Effect of the Time Ranges
The template's time ranges are copied to the run times of every process that uses it. They are copied when a process is added, when a process's work date is changed, and whenever the template is updated; a change to the template reaches the linked processes immediately.
A resource picks up an Automate process only if today is between the process's start and end dates and the current time is inside one of today's time ranges. The time is evaluated in the company's time zone.
The process does not run on passive days.
The processes' time ranges can be viewed on the Process › Calendar screen.
Work Dates List

Process › Work Dates
Top buttons
Button | Description |
|---|---|
New Record | Adds a new work date. |
Export | Downloads the Selected Records, Current Page or Current Filter records as Excel (XLSX, XLS), Open Document (ODS) or Text (CSV). |
Row actions
Action | Description |
|---|---|
Edit | Changes the work date's name, description, days and time ranges. The change is also written to the processes that use this template. |
Details | Opens the Process Work Date Details window. |
Delete | Deletes the work date. A work date used in a process cannot be deleted. |
⋮ › Info | Shows the user who created and modified the record, and the dates. |
By default the list shows Name, Description, Created User and Created Date; Modified User and Modified Date can be added with the column selector at the top right. Work dates are not enabled or disabled on this screen.
The Work Date Filters window, opened with Filters, filters by Name and Description and by created and modified date ranges.
Adding a New Work Date
Click New Record in the list; the Process Work Date New Record window opens.
Enter a Name (required, unique) and, optionally, a Description.
In the Work Dates panel, make the working days active and set their time ranges.
Click Save.

Process Work Date New Record — Weekdays 08:00–12:00 and 13:00–18:00
In a new record all days start passive. At least one day must be active; if no day is active, the warning ""Work Date" is required." appears. If a work date with the same name exists, the warning "Specified Name already exists." appears.
Setting days and time ranges
Item | Description |
|---|---|
Day header (Monday … Sunday) | Clicking the header makes the day active or passive. A day that becomes active starts with the range 00:00–24:00. |
Set All Days Active | Makes all seven days active with the range 00:00–24:00. |
Set All Days Passive | Makes all days passive. |
Slider | The start and end of the ranges are set with the handles in 5-minute steps. The coloured labels above show the ranges as "08:00 - 12:00". |
Add Time Range | Splits the day into equal parts with one more range than before, leaving a one-hour gap between ranges. The existing ranges are removed; adjust the new ranges with the slider. A day can have at most seven ranges. |
X on a label | Removes the range. It is not shown when the day has a single range. |
Editing
The Edit window has the same fields and panel; days with time ranges start active. When it is saved, the ranges of the changed days are written to every process that uses this template.
Work Date Details
Clicking Details in the list opens Process Work Date Details.

Process Work Date Details — Passive Days Collapsed
The window shows the Name, Description and the Work Dates panel read-only. Active days show their time ranges; passive days stay collapsed. The panel has no buttons for adding days or ranges. The processes that use the template are not listed in this window.
Button | Description |
|---|---|
Delete, Edit | Same as the row actions in the list. |
Previous / Next | Moves to the details of the previous or next work date in the list. |
Close | Closes the window. |
Deleting
A confirmation, "Are you sure?", is asked before deleting. A work date used in one or more processes is not deleted; the warning names the record and the processes that use it. To delete it, first select another work date in those processes, or clear the field and set the days on the process.